Featured Project Case Studies
Real-world examples of how we’ve solved complex electrical challenges across different industries and countries.
Namibian Grain Storage Facility Modernisation
Rundu/Sikondo, Namibia | 2014
The Challenge
Design and implement electrical systems for a 4000 MT grain storage facility with complex automation requirements.
Our Solution
We developed a comprehensive electrical solution integrating multiple automated systems:
- Designed custom switchboard configurations for optimal load distribution
- Implemented synchronized control systems for elevators and chain conveyors
- Engineered automated aeration fan systems with temperature monitoring
- Integrated advanced safety systems for dust control and equipment protection
Outcome
The facility achieved fully automated operation with minimal manual intervention, significantly reducing operational costs while maintaining optimal grain storage conditions.
Worldwide Satter Flowers Greenhouse Complex
South Africa | 2003/2004
The Challenge
Create an integrated electrical system for a large-scale greenhouse operation requiring precise environmental control.
Our Solution
Delivered a sophisticated electrical infrastructure combining:
- Computer-controlled roof ventilation with precise position feedback
- Advanced irrigation system integration with automated controls
- 500kVA generator backup system installation
- Artificial lighting systems optimised for plant growth
- Boiler heating system integration with safety controls
Outcome
Achieved a fully automated greenhouse environment with redundant power systems, ensuring optimal growing conditions year-round.
Siyalima Boerdery Citrus Handling Modernisation
South Africa | 2017
The Challenge
Upgrade and modernise a complete citrus handling and grading system while minimising operational disruption.
Our Solution
Implemented a comprehensive electrical upgrade including:
- Redesigned and modernised the main switchboard
- Integrated automated intake washing and drying systems
- Implemented coordinated control for sizing and grading conveyors
- Installed 500kVA generator backup with seamless switching
- Added motor protection systems across all equipment
Outcome
Successfully increased processing capacity while improving energy efficiency and reducing maintenance requirements.